$12B+ in project value managed on Consight

AI-powered preconstruction software for general contractors

Consight gives estimating and preconstruction teams one place to generate scopes, invite subcontractors, level bids, catch scope gaps, and execute subcontracts⁠—so you can bid faster with less risk.

  • Clayco logo
  • Alston Construction logo
  • Gray logo
  • Benchmark Construction logo
  • Pave America logo

What is Consight?

Consight is an AI-powered preconstruction platform built for commercial general contractors. It brings the entire preconstruction process into one place—from reading plans and specifications and generating scopes of work to managing subcontractor invitations, leveling bids, evaluating risk, prequalifying subcontractors, and sending and signing subcontracts.

By replacing disconnected software and manual workflows, Consight helps estimating and preconstruction teams bid on more projects, catch costly scope gaps, make better award decisions, and move faster from initial estimates to signed subcontracts.

Talk to sales

Move beyond standalone bidding workflows.

Bring your people, project information, and preconstruction workflows together in one place, from the first page turn through subcontract award.

AI Scope Generation

Build trade lists
and scopes in minutes.

Consight reads your plans, specs, and addenda, splits the work into trade bid packages, and drafts a scope of work for each one, ready to review and send to bidders.

Bidvite

Send bid invitations
automatically.

Consight builds a bidder list for every bid package and scores each subcontractor on their history with your team, distance, and usual job size. Review the drafted invite and send it to every bidder at once.

AI Bid Leveling

Compare bids
side-by-side, fast.

Choose the best subcontractor and reduce risk early with fast bid comparison and evaluation, collaboration tools, and integrated risk analysis.

Data Source Traceability

Click any result.
See exactly where AI found it.

Every price, quantity, inclusion, and exclusion linked to the original subcontractor proposal. Right-click any scope sheet cell to view the exact source line.

Bid Revisions

Request bid revisions
in seconds.

Consight uses AI to draft subcontractor bid revision emails for missing scope, exclusions, and clarifications. Review, send, and track revisions in one place.

Connie knows your entire project.Claude knows your prompt. Connie knows your entire project.

Ask Connie Anything.

Connie speaks construction, knows your documents, remembers the project, takes action, and handles massive files.

“When I saw Consight for the first time, I literally muted my microphone and screamed. I’ve spent my entire career wishing something like this existed.”

Lily Lenarduzzi-GomezSenior Estimator · The NRP Group

Bring organization
to every project

End-to-End Preconstruction Workspace

Bring organization to every project.

Starting a new project in Consight by asking Connie to create bid packages, with the plan set, project manual, and bid form attached

Set up fasterSet up your project in minutes

Turn plans, specs, and bid forms into an organized project structure without starting from scratch.

Consight bid grid showing total forecasted costs, packages awarded, and the status of each bid package

Stay organizedKnow where every package stands

Keep scopes, bidders, bids, revisions, comments, and decisions connected in one workspace.Track bid package status, awards, and outstanding items from one place.

AI bid leveling in Consight with a bidder's base bid, plugs, and leveled price beside its proposal, the cited line highlighted

Work from one source of truth

Keep project documents, scope, pricing, and team activity connected so everyone works from the same information.Connect documents, scope, pricing, and activity so everyone is working from the latest information.

Consight flagging an HVAC scope sheet line for review because the bidder's equipment brand does not match the spec book

Reduce risk before award

Catch missing scope, exclusions, overlaps, and pricing discrepancies while there is still time to fix them.

Consight estimate versions chart tracking the project total from the conceptual estimate to the bid set

Track every version

Save estimate snapshots over time, compare what changed, and keep a clear history of how the project evolved.

Increase Estimating Efficiency

Bid more work. Protect more margin.

  • Consight project dashboard listing active projects out to bid with status and bid due dates

    Bid more work with the team you have

    Save 40 hours per bid and give your team more time to pursue and win new work.

  • HVAC scope review in Consight flagging a $42,000 scope gap that none of the three bidders included

    Catch costly scope gaps

    Estimating teams using Consight have seen up to a 30% reduction in avoidable change orders.

  • Leveled HVAC bid summary for a recommended bidder with scope coverage, strengths, and concerns

    Award with confidence

    Submit every bid knowing the important scope, pricing, and risk items have been reviewed.

Live Collaboration

Precon is a team sport. Consight helps you actually work like one.Preconstruction is a team sport.
Consight helps the team actually work like one.

  • Three teammates working in the same glazing scope sheet with section owners, statuses, and comments

    Work together in real time

    Live cursors show who’s working where, while autosave keeps every change synced in real-time.

  • Plan sheets in a Consight project file list with per-sheet processing status

    Review bids and plans from any device.

    Access plans, level bids, and review scopes on your desktop, tablet, or phone. No downloads required.

  • Highlighting a plan sheet in Consight while teammates discuss the scope in a comment thread

    Annotate bids as you review

    Highlight, annotate, and comment directly on bids so decisions don’t get lost in folders or separate apps.

Why preconstruction teams choose Consight

  • Works with any file format

    Upload PDFs, spreadsheets, pictures, and messy subcontractor proposals. Consight turns them into structured line items on your scope sheet.

    See document intake
  • Built to replace Excel

    Consight is a web-based platform designed to replace Excel bid tabs. Structured math and built-in guardrails remove the mistakes that come from formulas, hidden rows, and manual entry.

    See bid leveling
  • Keep your existing process

    Consight adds structure without forcing estimators to give up the flexibility and judgment they rely on. Consight supports a work breakdown structure (WBS) by cost code and location, so you can connect your bid leveling to your estimates.

    Explore the product
  • The estimator stays in control

    Consight handles the reading and setup. Your team still makes the pricing, scope, and award decisions.

    See the scope sheet
Hennie van Niekerk, Preconstruction Manager

Consight gives our team a more consistent way to catch scope gaps before award.

Alston Construction logo

Move fast on competitive bids.
Go deep on negotiated bids.

Competitive bids

Handle the bid flood

  • Upload your documents, AI sets up your projectDrop in the full bid set, scope sheets build themselves
  • Bids get leveled instantly as they come in
  • See the gaps and the risk before your number goes out

Negotiated work

Protect your margin

  • Check every scope line against the spec book
  • Version the estimate as design moves from SD through GMP
  • Show what's carried, what's excluded, and where allowances sit

Enterprise Grade

Built for scale.
Built for bid day.

Built by professionals from top commercial GCs on thousands of real projects—from data centers and space launch facilities to Tesla factories and airports.

bid extraction accuracy
98%
bids leveled to date
450k
to generate all scopes
3–4 min
to level bids
2 min

Integrations

Works with the tools your estimators already use.

  • BuildingConnected, Procore, and Excel logos side by side

    Keep your preconstruction workflow connected

    Sync project data across BuildingConnected, Procore, Excel, and Consight so your team spends less time re-entering information.

Change Log

Consight ships new features every week
to help your team bid better.

Requirements in every scope

Connie finds each requirement and cites its page.

Ask about any spot

Box, pin, or select a shape and ask Connie.

Subcontractor registry

Subs from licenses, permits, and public filings.

Projects from documents

Drop in the plans and the project sets itself up.

The 8 Foundations of Estimating

The foundations of modern estimating. Eight principles for faster, more predictable preconstruction.

Read the 8 Foundations
Aerial view of a large Clayco building under construction at dusk

Built for Commercial General Contractors

The AI preconstruction platform
built to win bids.

Turn plans and subcontractor proposals into complete scopes, leveled bids, and confident awards—faster.