Run preconstruction in one place.

All projects
Mariners Hospital
v1In progress
Bid Packages
Files
Bid Form
Versions
Information
Team
Share
Total forecasted costs
$3,738,456.00
Awarded
5/ 35 packages
Needs attention
2Review →
All packages35
Find⌘F
Sort: CSI cost codeColumnsExport
Add Bid Packages
Code
Bid Package
Status
Total Price
Awarded Bidder
Low Bidder
Bids
Bid Leveling
1
2-015
Grade Staking
Complete
$36,000.00
SCSouthland Civil Eng.
PEPlump Engineering$15,200.00
3
Level bids →
2
2-050
Demolition
In Progress
–
No award yet
JSJarrett Site Work, LLC$142,900.00
3
Level bids →
3
2-200
Earthwork
Soft Awarded
$1,199,022.00
RCRedpoint Contracting
SDScott Diversified$682,969.00
2
Level bids →
4
2-510
Asphalt & Striping
In Progress
–
No award yet
UPUnited Paving Co$153,700.00
2
Level bids →
5
2-570
Site Concrete
Complete
$2,500,000.00
CCConcrete Concepts
CPCommand Performance$204,712.00
3
Level bids →
6
2-720
Utilities
Missing Bids
–
No award yet
No bids
Level bids →
7
2-910
Landscape and Irrigation
In Progress
–
No award yet
CLCalpak Landscape Inc$69,650.00
4
Level bids →
8
3-210
Reinforcing Steel
In Progress
–
No award yet
SISci, Inc$115,100.00
3
Level bids →
9
3-460
Structural Concrete
In Progress
–
No award yet
SISci, Inc$685,100.00
1
Level bids →
Connie
Level the earthwork bids for 2-200
Read Scott Diversified — Earthwork Proposal.pdf and matched 46 of 52 scope lines.
Checking exclusions and alternates…
Connie is reading the proposal…

Organize Your Projects

Start your project in one organized workspace.

  • Consight project file manager showing Bids, Plans, Specs and Bid Forms folders with recent uploads

    Project Files

    Keep plans, specs, bids, bid packages, and project files organized together.

    Learn more
  • Searching a Consight project for "elevator" and matching spec sections, drawings and bid packages

    Smart Document Search

    Search across plans, specs, bids, and project files without digging through folders.

    Learn more
  • Consight BidGrid summarizing bid package status, awarded packages and items needing attention

    Package Status

    Track every package's status from bidding through award with clear status and visibility.

    Learn more

Build Your Scope

Build the scope first. Then invite bidders.

  • Consight generating a scope of work with line items and inclusions read from project documents

    AI Scope Generation

    Generate detailed scope sheets directly from project plans and specifications.

    Learn more
  • Editing scope sheet line items and exclusions directly in Consight

    Flexible Scope Sheets

    Build, edit, and organize scopes without fighting rigid spreadsheets.

    Learn more
  • Uploading subcontractor bids for a concrete package, with proposals from two bidders listed

    Fast Setup

    Drop in bids. Consight pulls bidder details, contacts, and base pricing automatically.

    Learn more

Level & Analyze Bids

Compare every bidder quickly and surface risk before award.

  • Leveled bid comparison for a concrete package showing each bidder's line item pricing and leveled price

    AI Bid Leveling

    Extract and normalize subcontractor bids into one comparable scope.

    Learn more
  • Consight gap review flagging exclusions, alternates, plugs and missing pricing across bids

    Close the Gaps

    Identify exclusions, alternates, plugs, and missing scope before they become change orders.

    Learn more
  • A subcontractor proposal PDF with the matching scope sheet row highlighted for traceability

    Traceable AI Insights

    See exactly where every result came from inside the original bid, plan, or specification.

    Learn more

Build the Estimate

Turn leveled bids into a complete, reliable estimate.

  • Work breakdown structure in Consight grouping scope by phase with category and cost columns

    Work Breakdown Structure

    Organize estimate costs into clear scopes, phases, and cost categories.

    Learn more
  • Estimate summary in Consight with bid package subtotals plus general conditions, contingency and fee markups

    GC Costs & Markups

    Layer in general conditions, general requirements, contingencies, and markups to complete the estimate.

    Learn more
  • Estimate version history charting total cost across design milestones from 30% DD to bid set

    Versions & Reporting

    Track estimate changes over time and export clean reports whenever you need them.

    Learn more

Collaborate & Connect

Keep the entire team working from the same information.

  • Several teammates editing the same Consight scope sheet at once with live cursors

    Real-Time Collaboration

    Work together directly inside your web based project instead of passing spreadsheets around.

    Learn more
  • Plan sheets uploading to Consight with per-file processing status

    Share Anywhere

    Review Consight from the office, jobsite, or a client meeting without installing software.

    Learn more
  • Importing projects from BuildingConnected into Consight

    Integrations

    Bring information in from the tools your estimating team already uses like Procore or BuildingConnected.

    Learn more

Product questions

What is Consight?

Consight is a web-based AI preconstruction platform for commercial general contractors. It takes a project from plans and specs to scope sheets, leveled subcontractor bids, an estimate and an award decision in one workspace.

How does Consight build a scope of work?

Upload your plans and specifications and Consight generates detailed scope sheets by trade. Every scope stays fully editable, so your estimators decide what goes out to bidders.

How does AI bid leveling work in Consight?

Consight reads each subcontractor proposal, extracts pricing, inclusions, exclusions and alternates, and maps them to your scope so every bidder is compared on the same lines. Missing scope and exclusions are flagged before award.

Can I check where the AI got a number?

Yes. Every extracted value links back to the original bid, plan or specification, so you can open the source and confirm it before you carry the number.

Can my team work in Consight at the same time?

Yes. Consight runs in the browser with real-time collaboration, so estimators can work on the same project from the office, the jobsite or a client meeting without installing software or passing spreadsheets around.

Which tools does Consight integrate with?

Consight connects to BuildingConnected and Procore and imports and exports Excel, so project data moves between the tools your estimating team already uses.
Still have questions? Talk to sales