Preconstruction and Estimating Guides
Preconstruction and estimating guides for GCs: a bid day checklist, a framework for estimating with AI, and how to get more complete subcontractor bids.
Construction Material Prices: Latest PPI and What to Bid
BLS producer prices for nonresidential construction goods rose 11.2% in the year to September 2026, led by metals and diesel. Escalate each trade by its index.
Subcontractor Prequalification Form: Free Excel Template
A free subcontractor prequalification form in Excel and PDF: safety, financial, bonding, and insurance questions, weighted scoring, and a job size limit.
Construction Bid Day Checklist for General Contractors
A bid day checklist for general contractors: bidder coverage, addenda, scope review, bid leveling, plugs, and final numbers, from the week before to submission.
Markup and Margin Calculator for Subcontractor Bids
Markup is profit over cost; margin is profit over the sell price. A 10% markup on a $500,000 sub bid is a 9.09% margin. Convert either way and price the bid.
Labor Burden Calculator: Fully Burdened Rate for Bids
Calculate a fully burdened labor rate for a bid: base wage plus payroll taxes, unemployment, workers' comp, and benefits, per paid and productive hour.
How to Build the Business Case for Preconstruction Software
A preconstruction software business case: compare the license to estimator labor and scope risk, and find the hours or scope gaps that pay for it each year.
Construction Cost Escalation Calculator: Midpoint Method
Escalate an estimate to the midpoint of construction, compounded yearly. At 5% a year and 18 months to the midpoint, $10M escalates 7.59%. Pick a cost index.
Construction Schedule of Values Template: Free Excel and PDF
A free construction schedule of values template in Excel and PDF, with CSI lines, change orders, retainage, and payment due. How to fill in every column.
When Only One Subcontractor Bids: What a GC Should Do
The median bid package we measured drew 2 bidders, and 45% drew three or more. What to do when one sub bids: find out why, re-solicit, level, check the price.
Estimating, Bidding, and Bid Leveling Are One Workflow
Estimating, bid management, and bid leveling are stages of one preconstruction workflow. See why software split them and what a connected workflow looks like.
Why Subcontractors Hate Your Bid Platform (and What to Do)
Why subcontractors avoid GC bid platforms on bid day, and practical ways general contractors can get more complete bids without forcing another portal.
How to Check Davis-Bacon Wage Rates in Subcontractor Bids
Check that sub bids on public works carry the right Davis-Bacon rates: the wage determination, its latest modification, every classification, and the fringes.
Consight Sponsors Jack Selby Talk on Reindustrialization
Consight sponsored the speaker for a talk with Jack Selby of Thiel Capital at UC Irvine on November 2, 2026, on technology and reindustrializing America.