A large general contractor’s RFP for AI bid leveling software should test five things: whether the tool levels against your scope (not just against other bids), whether it finds and prices missing scope, whether every result traces back to the source proposal, whether it works with BuildingConnected and Procore, and whether it passes an enterprise security review. Consight publishes this checklist and fills in its own answers below, so ask every vendor, including Consight, to prove each one on your packages.
Key takeaways
- Almost every AI tool can read a proposal. The real test is whether it finds what a subcontractor did not price.
- Traceability to the source document is non-negotiable at enterprise scale.
- Ask for references from GCs at your revenue size. Consight’s customers include $500M to $5B+ commercial GCs such as Clayco, Gray Construction, Alston Construction, W.M. Blanchard, and NRP.
Which bid leveling requirements matter most?
| Requirement | Why it matters | Consight |
|---|---|---|
| Reads PDF, Excel, and Word proposals, scans included | Real bids are messy | Yes |
| Levels line by line against your scope sheet | Comparing bids to each other misses shared gaps | Yes |
| Puts each inclusion and exclusion on the line it affects | Exclusions are where risk hides | Yes |
| Prices missing scope with plugs the estimator adds | Makes totals comparable | Yes |
| Keeps alternates in their own section | Keeps the base bid clean | Yes |
| Normalizes units and quantities where units convert | Unit-price trades are hard to compare | Yes |
| Keeps earlier versions of revised bids | Late changes cause gaps | Yes |
| Flags outliers against your internal estimate | Catches bids that are too good | Yes |
| Links every value to its source | Every finding must be verifiable | Yes |
| Lets the estimator edit every adjustment | People make the award call | Yes |
| Exports the bid tab to Excel | Owners and project teams need a bid tab | Yes |
Which integration requirements should you include?
- BuildingConnected. Projects, bid packages, bid form lines, bids, files, and contacts should import automatically. Consight imports them, and new bids keep arriving on their own after the first import.
- Procore. Projects, bid packages, bid forms, bids, and files should come in without retyping. Consight imports them from Procore, including the lines of each package’s first bid form. It does not write awards or cost data back, so if you need that, make it a separate requirement for every vendor. Procore also offers its own AI tool, the Bid Leveling Agent, so score it against these tables too.
- Excel. Estimators will still export. Consight exports scope sheets and whole projects to Excel.
Which security requirements should you include?
| Requirement | Consight |
|---|---|
| SSO (SAML, OIDC) | Yes |
| MFA, enforceable through your identity provider | Yes |
| Role-based permissions at organization and object level | Yes |
| Tenant isolation at API, database, and object levels | Yes |
| Database in the US, files stored in North America | Yes |
| No model training on your data | Yes |
| Sub-processor list published in the Trust Center | Yes |
| Audit logging (discussed on request) | No |
Send security questionnaires to security@consight.ai, or review the Trust Center.
What questions should you ask every vendor?
- Show us a bid where your tool found scope that none of the bidders carried.
- Click on a flagged exclusion and show us the proposal text behind it.
- Level one of our worst historical packages, with scanned PDFs and revisions, live.
- How does a bid get from BuildingConnected into your tool, and who retypes anything?
- Who are your customers above $500M in revenue, and can we talk to one?
- What happens to our documents after the AI reads them?
How do you score the RFP?
Weight scope gap detection and traceability highest, then integrations, then security, then price. Validate scores with a pilot on your own packages. See how to pilot AI bid leveling software at a large GC.
Where Consight fits
Consight is the preconstruction workspace built around this kind of work—from understanding project documents and building scopes to collecting bids, leveling proposals, reviewing risk, and documenting the final award.
Put it into practice on your next project.