Textura Fee: What Subcontractors Pay and How to Level It

Photo of Stewart ToubiaStewart ToubiaPreconstruction insights

Textura is Oracle's construction payment software, sold as Oracle Textura Payment Management. General contractors use it to collect pay applications, lien waivers, and compliance documents from subcontractors and to pay them. Oracle charges each subcontractor a usage fee of 0.22% of contract value, up to $5,000 per contract on projects created after January 19, 2023. The general contractor can choose to pay it instead.

So estimators carry a Textura line on the bid tab. A bid that leaves the fee out costs more than its number says.

What is Textura?

Textura is an online system for construction invoicing and payment. Oracle's help center describes Oracle Textura Payment Management (TPM) in three points:

  • "Pay application documents are automatically generated, electronically signed, and available online for review and approval."
  • "Payments are made electronically, resulting in faster access to funds."
  • "Compliance documents can be submitted and tracked online."

Older contracts and guides call the product Textura CPM. Levelset's guide for subcontractors expands CPM as Construction Payment Management. When a subcontract says Textura, TPM, or Textura CPM, it means the same payment system.

Who owns Textura?

Oracle owns Textura. In April 2016, Textura agreed to sell to Oracle for $26.00 a share in cash, about $663 million net of Textura's cash. Oracle put Textura in its Engineering and Construction Global Business Unit.

The deal closed on June 10, 2016, and Textura became a subsidiary of Oracle. Oracle's announcement of the purchase counted more than 85,000 general contractors and subcontractors on the platform.

What does Textura do on a job?

Textura runs the monthly billing cycle between the general contractor and its subcontractors. Oracle's Textura FAQ for subcontractors describes each step:

  1. The GC opens a draw. A subcontractor cannot bill until the GC opens the draw for the period.
  2. Each subcontractor submits an invoice against the draw and signs its billing documents and lien waivers in Textura.
  3. The GC approves or rejects the invoice. A subcontractor signs and resubmits a rejected invoice.
  4. The subcontractor's compliance manager uploads documents the GC requires: once, on a schedule, or when an invoice meets a preset condition.
  5. Payment goes out electronically through Textura. Oracle tells subcontractors that signing the unconditional lien waiver when they submit the invoice keeps payment on time.

A subcontractor can also ask its own sub-tier subcontractors and suppliers to sign lien waivers through Textura. The GC approves those waivers too.

GCs add their own rules on top. Shawmut's Textura application for payment procedure asks subcontractors to complete AIA G702 and G703 billing forms and a partial lien waiver in Textura by the 20th of the month.

Who pays the Textura fee?

The subcontractor usually pays the Textura fee. The GC can choose in Textura's project settings to pay it instead. Oracle calls it the subcontractor usage fee, and its FAQ says Textura "automatically deducts the fee from the subcontractor's nominated chosen payment method" when the subcontractor confirms the contract.

The subcontract makes it binding. Shawmut's procedure states: "Subcontractor shall be responsible for the fees and costs owed associated with Subcontractor's use of TPM." The same clause tells the subcontractor to pass a similar term down to its sub-subcontractors and suppliers. Read the subcontract on each job, because the GC decides who carries the fee.

How much is the Textura fee?

The Textura fee is 0.22% of contract value, with a cap that depends on when the GC created the project in Textura. Oracle's help center and subcontractor usage fee notice set these rates for North America. The notice dates the change from January 19, 2023 itself:

Contract Textura fee
Subcontract, project created after Jan. 19, 2023 0.22% of contract value, at most $5,000
Subcontract, project created before Jan. 20, 2023 0.22% of contract value, at most $3,750
Sub-tier contract (sub-subcontractor or supplier) $100 flat per contract
Minimum fee (projects created after Jan. 19, 2023) None

The $5,000 cap applies to contracts of $2,272,727 or more, per Oracle's notice. Below that amount, multiply the contract value by 0.22%. Oracle's notice adds that applicable taxes apply.

A few examples at 0.22%:

Subcontract value 0.22% of value Textura fee
$50,000 $110 $110
$800,000 $1,760 $1,760
$1,500,000 $3,300 $3,300
$3,000,000 $6,600 $5,000

Oracle charges the fee when the subcontractor accepts the contract in Textura. Oracle revises the fee for significant changes in contract value until the contract is complete. Billing done outside Textura does not count toward the fee. When the amount paid exceeds the contract value, Oracle uses the amount paid.

Why does a bid tab carry a Textura line?

A bid tab carries a Textura line because bidders handle the fee in different ways. One bidder builds the fee into the price. Another lists it as an add. A third excludes it in the fine print. You compare bids at equal scope and equal cost, so each bid needs the fee in or out the same way.

The fee can change a close rank. Say two drywall bidders sit $2,000 apart:

Bidder Bid Textura fee in bid? Fee to add Leveled price
Bidder A $1,240,000 Yes $0 $1,240,000
Bidder B $1,238,000 No $2,724 $1,240,724

Bidder B looks $2,000 lower on page one. With the fee added, Bidder B sits $724 higher.

How do you account for the Textura fee when leveling bids?

Treat the Textura fee like tax or bond cost: a known rate that some bids include and some leave out.

  1. Check the bid documents. Confirm the job runs on Textura and the subcontract makes the subcontractor pay the fee. Say so in the invitation to bid, so bidders price it. If the GC pays usage fees on the project, do not add the fee to any bid.
  2. Read each proposal for the fee. Search the exclusions and qualifications for "Textura", "TPM", "billing fee", or "0.22%".
  3. Mark each bidder. Note whether their number includes the fee, excludes it, or does not say.
  4. Add the fee to each bid that excludes it. Use 0.22% of the bid, up to $5,000. Use the $3,750 cap on a project created before January 20, 2023.
  5. Ask the unclear bidders. Get each answer in writing, then update the mark.

The $100 sub-tier fee belongs to each sub-subcontract. Each sub-subcontractor or supplier pays its own $100 fee and may price it into its quote, so it is already inside the bid you compare. You do not add it.

Does the bid leveling template include the Textura fee?

Yes. Consight's free bid leveling template has a Textura fee row beside tax and bond. You set the rate once, then mark Y or N for each bidder. The sheet adds the fee on that bidder's subtotal plus tax, rounds it up to the next dollar, and stops at the cap you enter beside the rate.

The rate starts at 0.22% and the cap at $5,000. Download the Excel file. Change the cap to $3,750 on a project created before January 20, 2023.

What other payment tools work like Textura?

Other GCs collect pay applications and lien waivers in other tools. Procore says its Pay tool builds on Procore's invoice management tools to handle subcontractor invoice payments and the lien waiver exchange. Procore Pay generates the lien waivers on a subcontractor invoice and emails the invoice contacts to sign them.

Some subcontractors bill Textura jobs from their own software. Siteline, a billing tool for subcontractors, describes a Textura integration: project details, schedules of values, and change orders flow from Textura into Siteline, and finished pay applications flow back. The GC still runs the job in Textura.

Whatever the tool, the subcontract says who pays its fees. Level each fee the same way you level the Textura fee.

Where Consight fits

Consight is the preconstruction workspace built around this kind of work—from understanding project documents and building scopes to collecting bids, leveling proposals, reviewing risk, and documenting the final award.

Put it into practice on your next project.

Talk to sales

Trust your bid on bid day. Get Consight.

Start now