Skip to content
Consight logo
Back

Why is Leveled Price higher than Base Bid?

Leveled Price is higher than Base Bid when cost was added in leveling: plugs for missing scope, corrected quantities, or scope added to match required work.

1 min read

  1. Check for plugs added for missing scope.
  2. Check for corrected quantities.
  3. Check for scope added to match the required work.

Tip: Every plug should be labeled. If you cannot tell why a price moved, the plug was not labeled clearly enough.

More in this section

Still stuck after the steps? Email support@consight.ai.

Consight documentation